Attendance registration in cleaning: Checkinatwork without chaos

A cleaning company rarely works in one single place. In the morning your teams spread out across offices, schools, hospitals and production halls, sometimes three sites in one day. That is exactly why attendance registration in cleaning is so much harder than in a factory with one clocking terminal at the gate.
Since 1 September 2024, that registration is no longer a choice for part of the cleaning activities either, but a legal obligation via Checkinatwork (CIaW/CIaO) of the NSSO. Below you can read when the obligation applies, what exactly you need to submit and how to organise it without your team leaders juggling lists every morning.
What is Checkinatwork again?
Checkinatwork is the NSSO's online service for attendance registration on works in immovable state. Construction companies traditionally know the system from large sites: there you have to register attendance as soon as the total value of the works amounts to €500,000 (excl. VAT) or more.
Different thresholds apply to cleaning and maintenance activities. There, the registration obligation is not tied to that €500,000, but to the question of whether a declaration of works (Article 30bis) is required for the assignment. More background from the NSSO itself: Checkinatwork and declaration of works.
When do you have to register as a cleaning company?
The obligation applies to cleaning activities whose purpose is to clean an immovable property on behalf of third parties — not your own office, but your client sites. And only where a declaration of works is required.
That declaration obligation depends on the contract value and on the number of subcontractors:
- more than €30,000 (excl. VAT) without a subcontractor;
- more than €5,000 with one subcontractor;
- always, regardless of the amount, as soon as you work with two or more subcontractors.
In practice: an annual contract for the daily maintenance of an office building with four full-time equivalents quickly exceeds €30,000. A one-off end-of-works clean of €2,800 that you carry out on your own falls outside the scope. So it pays to do the sums per contract at the start-up stage — the declaration has to be in place before the works begin.
Also note a difference with construction: for maintenance and cleaning activities, both the IN and the OUT registration are compulsory. Checking in alone is not enough.
What exactly has to be registered?
Per person and per site you record:
- who is present: employees, temporary agency workers, employees of your subcontractors and self-employed subcontractors;
- where: the site, linked to the site number from the declaration of works;
- when: the time of arrival and of departure.
The registration takes place daily and the check-in must happen before the person starts work. For the client and the main contractor this is no small detail: they have an interest in every link in the chain registering correctly.
Six practical ways to handle it on site
The NSSO allows various channels. Which one suits you depends on the type of sites you run:
- Mobile app or website — the cleaning operative checks in herself with her eID or a username.
- QR poster on site — handy for sites with changing teams and agency workers.
- Badge reader or registration device on site — interesting for large sites with a fixed team.
- Registration by the team leader for the whole team on arrival.
- Web service or batch submission from your own HR software.
- A combination of these, for example an app for mobile teams and a fixed terminal at the main site.
Option 5 is the tipping point. As long as your registration sits separately from your planning, you type everything in twice: once to know who is supposed to be where, and once to prove that the person was actually there. With twenty sites a day, that is half an hour of pointless admin every morning.
Link registration to your planning, not to a second system
The difference between a burden and a tool lies in the link. In Forganiser, everything starts from the same schedule: you plan a team on site X from 6 to 9 a.m., the employee checks in and out on that site, and the registration flows through to both your attendance obligations and your hours processing and payroll calculation.
That delivers three things at once:
- Evidence. During a social inspection you can show, per site and per day, who was present and for how long.
- Margin per site. You immediately see whether those 3 planned hours really were 3 hours, or consistently 3 hours 40. That difference determines whether a maintenance contract makes a profit or a loss.
- Faster response to no-shows. Anyone who has not checked in by 6.15 a.m. on a site that started at 6.00 a.m. stands out before the client calls.
You can read more about how to turn those hours into correct wages and documents on administration and on our sector page for cleaning and building services.
Five mistakes we often see
- Forgetting the declaration of works on contract renewals. An extended or expanded contract may require a new or amended declaration.
- Only registering IN. For cleaning, both IN and OUT are compulsory; half registrations are not compliant.
- Simply trusting subcontractors. If you work with subcontractors, you also monitor their registrations, not just those of your own team.
- Entering registrations after the fact. Keying in the whole week on Friday is no longer attendance registration, it is reconstruction.
- A separate system alongside the planning. Two sources of truth guarantee differences between what was planned, registered and paid out.
Set it up more broadly straight away
There is another reason to get this right now: digital time registration is becoming the norm anyway. Anyone already working today with watertight digital registration, including breaks, overtime and actual working time, will not have to change anything later on. We wrote about it earlier in digital time registration: why every HR department gains from it.
So don't look at your registration as an NSSO formality for a handful of large sites, but as the backbone of your workforce administration: from planning through Dimona to payroll processing.
Checklist for the next two weeks
- List your current contracts with their annual value and the number of subcontractors.
- Mark which contracts exceed the €30,000 and €5,000 thresholds.
- Check whether a declaration of works exists for those sites and whether the details are still correct.
- Choose your registration channel per site type: app, QR poster or fixed terminal.
- Brief your team leaders: check in before starting, check out on leaving, every day.
- Link the registration to your planning, so that planned and performed hours sit side by side.
- Schedule a quarterly review: sites without an OUT registration, structural deviations, missing subcontractors.
In doubt about a specific contract or a borderline case? Check it with your social secretariat or consult the NSSO instructions. The rules are too specific to go by gut feeling, and too easy to automate to keep losing time on them every month.